Energy Systems Master Planning and Implementation Program
Elevate plans, engineers, funds and builds the energy upgrades a New York City building needs, under one long-term plan.
What Is Elevate
A 20-Year Energy Implementation Plan, Funded and Built by One Firm
Elevate answers the four questions owners face before upgrading a building.
01 / 04
What to Upgrade
Every system inventoried and tested against the building’s energy model.
- Emergency UpgradesUrgent equipment needs, scoped and planned rather than rushed.
- Repair vs. ReplaceBased on condition, remaining useful life and the long-term plan for each system.
- Efficiency Measures150+ measures across heating, cooling, envelope, electrical, solar and storage.
02 / 04
What Comes First
Fast-payback and emergency needs first, with capital projects sequenced after.
- ComplianceLL97, LL88, LL84 and LL87 requirements built into the plan.
- Building GoalsBudget, carbon, comfort and ownership priorities, with staff input.
- Comfort & OperationsHeat, hot water and ventilation complaints factor into what is addressed first.
03 / 04
How to Fund It
Incentives, financing and BetterCity capital secured before construction begins.
- Incentives, Rebates & Tax SavingsIdentified during equipment selection and processed in-house.
- FinancingLoans, PACE, utility loans and EaaS compared.
- Capital PlanningDeveloped with ownership around the building’s budget and goals.
04 / 04
When to Build
In phases, each one released with your approval.
- Phase 1Fast-payback and urgent measures at fixed pricing.
- Phase 2Capital projects released in the planned sequence.
One Program, Delivered in Four Stages
Every project includes Core, the free assessment and plan. Plus, Pro and Elite carry the plan out, each approved under its own contract.
The Firm That Writes the Plan Builds It.
Plan. Engineer. Fund. Build.
BetterCity’s own teams do most of the work.
Plan
Energy Auditing
Site surveys and lighting audits by our own auditors.
Engineer
Engineering & Design
Energy models, measure analysis, drawings and DOB filings.
Fund
Incentives
Applied for and processed through payment by our own team.
Financing
Options compared and arranged by our own team.
Build
Procurement
Leveled bids and direct purchasing through our affiliated sourcing company.
Electrical
Electrical work by our affiliated electrical contractor.
Construction
Construction management, site supervision and closeout.
Commissioning & M&V
Testing, commissioning, and measurement and verification.
The Process
How an Elevate Project Starts
A Conversation With an Engineer
About the building, its equipment and what is coming due.
A Site Visit
Our auditors walk the building and its equipment.
Your Elevate Core Report
Free, about two weeks after the site visit: the plan for every energy system.
Your Decision
Approve Phase 1 at the report’s pricing. Phase 2 moves when you release it. Reviews every six months, with annual LL84 benchmarking and LL97 analysis.
Who We Work With
Owners, Boards and Managers Get One Accountable Partner—From Engineering to Delivery
Elevate brings engineering, electrical work, construction and incentive coordination under one roof, on one coordinated schedule.
Elevate fits when:
- A boiler, chiller or other major system is near the end of its life.
- Local Law 97, 88, 84 or 87 requirements are coming due.
- Heat, hot water or ventilation complaints keep coming back.
- The board needs a capital plan, not another one-off project.
Elevate Core
Get a Master Plan
Every Elevate project starts with a free Elevate Core report.